中文版   English  
 
News Center
 · Strengthen the three dialectic
 · Let mobile compressor run fast
 · Polyurethane insulation cotton
 · Air to water heater industry -
 · Vacuum drying box using the pr
 · Heat pump quality guarantee "c
 · Air compressor motor protectio
 · Water pump
Contact Us
  • Address:Qinghu cun, Qishi Town, Dongguan, Guangdong Province
    Contact Person:Mr Yan
    E-Mail:zhihe998@126.com
    Tel:+86-0769-86723636
    Fax:+86-0769-81080026
    Mobile:13829228807  
               13829282260
    QQ:2463307187    
    WebSite: www.dg-zhihe.cn

 
News Center Location: Home > News
 

Screw type air compressor is long-term running correctly handling
Author: www.dg-zhihe.com      Release Date:2012/11/2      View Count:3890
 

Screw type air compressor of long-term operation of how to deal with

Some enterprises may be due to production purchasing adjustment, screw compressors the opportunity to temporarily stop running, so how to correctly handle the shutdown of the screw compressor?

Screw type air compressor in long-term shutdown, shutdown time according to should abide by the following methods, especially at temperatures below 0 degrees and high humidity area or season should pay more attention to treatment, or equipment failures may occur, and affect the normal service life.

Screw type air compressor shut down for 1months or more processing method:

1air compressor shutdown before there is any fault, should be placed so that the repair is good, for emergency use.

2air compressor shutdown when the oil cooler, cooler water completely after discharge clean, avoid cooler under low temperature and frost crack.

3plastic paper or paper to air compressor controller, power distribution boxes and other electrical equipment package, to prevent the gas invasion.

4air compressor shutdown after two or three days will oil and gas barrel, oil cooler after cooler, the condensed water.

Screw type air compressor shutdown for more than 3 months in addition to the above procedure, do the following processing:

1deactivated before replacement of air compressor lubricating oil, and running for 30 minutes, two or three days after the exclusion of gas tank and oil cooler condensation water.

2the condensed water discharged completely.

3air compressor all closed, to prevent moisture, dust into the.

4air compressor in less dust, air drying and storage.

Screw type air compressor in long-term shutdown operation, should be strictly in accordance with the above procedure reasonable maintenance, to prevent due to external conditions makes the air compressor parts damaged, this also eliminates the use before the repair cost.

 
专业提供:空压机热水器空压机余热回收空压机余热利用空气能热水器系列
Address:Qinghu cun, Qishi Town, Dongguan, Guangdong Province Tel:+86-0769-86723636 Fax:+86-0769-82820762
All rights reserved © DongGuan ZhiHe Mechanical and electrical equipment Co., LTD   
网站地图    sitemaps